Airbus

Merriman Anderson Architects

60,000sf first generation interior finish out of new tilt wall structure as building was being completed by shell building contractor. Project included 16,500 sf of new offices, breakroom, conference/training rooms, and restrooms as well as 43,500 sf of light production/assembly area for high-tech defense equipment with necessary compressed air & power drop connections, new RTU’s and structural supports, insulated perimeter walls, high bay lighting, epoxy floors, new dock openings/doors cut into the tilt wall panels, and a new 100kW diesel generator set.